|
PROJECTS
COMPLETED
1)
CONSTRUCTION OF POL TANK
WAGON , BRIDGE & LAYING OF TRACKS.
2)
EARTHWORK IN FORMATION , CONSTRUCTION
OF BRIDGE & COMMISSIONING OF SIDING.
3) PROVIDING
LPG BOTTLING PLANT & CIVIL WORK OF SHED.
4) DIFFUSED
AERATION SYSTEM , PLANT & DOMESTIC PILING SYSTEM OF WWTF PLANT.
5) CONSTRUCTION OF OVERHEAD TANK,
MUMBAI.
6) CONSTRUCTION
OF COMPOUND VALVE, VERSOVA.
7) CONSTRUCTION OF MAJOR BRIDGE AT 2174.
8) CONSTRUCTION
OF MAJOR BRIDGE AT 400/2 & 383/2.
9) CONSTRUCTION
OF MAJOR BRIDGE AT CH 3425.
10) CONSTRUCTION OF MAJOR BRIDGE , GAUGE CONVERSION 411/3.
11) SUPPLY OF 50mm HAND BROKEN STONE BALLAST.
12) SUPPLY & STACKING OF HAND BROKEN
BALLAST.
13) CONSTRUCTION OF FOUNDATION STRUCTURE ,
DAUND.
14) CONSTRUCTION OF FOUNDATION STRUCTURE ,
AHMEDNAGAR.
15) CONSTRUCTION OF WIDENING OF MINOR BRIDGE 516 - 589.
16) CONSTRUCTION OF FOUNDATION & SUBSTRUCTURE OF ROB.
17) CONSTRUCTION OF COMPRESSOR ROOM ,
DHULE.
18) CONSTRUCTION / REPAIR OF EXISTING ROAD OF M/s IOC AT
AURANGABAD.
19) CONSTRUCTION OF SALES Bldg., AT BELAPUR Dist.DHULE.
20) DEVELOPMENT OF RETAIL OUTLET , M/S
IOCL.
21) COMPLETE TRACK RENOVATION WORK OF UPGRADATION OF KALUMNA
KORADI.
22) DIVERSION
ROAD FOR ROB AT KHEDGAON.
23) DEVELOPMENT OF MAFAH RETAIL OUTLET AT
ORISSA.
24) DEVELOPMENT
OF MAFAH SITE RETAIL OUTLET AT ARJUNDA (ORISSA).
FOR M/s BPCL-PHASE-II WORKS.
25) CONSTRUCTION
OF SUPER-STRUCTURE FOR R.O.B AT CHALISGAON.
26) CONSTRUCTION OF ADDITIONAL OPENING FOR WIDENING OF BRAHMANWADA NALLA IN
MUMBAI DIVISION OF CENTRAL RAILWAY.
27) REHABILITATION OF Br.No.403/1 BY JACKETING OF ABUTMENTS WITH DESIGN MIX CONCRETE IN
IGATPURI-BHUSAWAL.
28) THROUGH SLEEPER RENEWAL INCLUDING DEEP SCREENING LOADING, UNLOADING OF
P.WAY MATERIAL.
29) PERMANENT WATER SUPPLY TO TAPP AT TARAPUR , USING SPACE BLOCKS.
30) PROVIDING , LOWERING,
LAYING, JOINTING, TESTING OF WATER MAIN LINE BY JACK & PUSHING
METHOD AT RAILWAY CROSSING , PUNE.
31)
DESIGNING AND EXTENSION OF BRIDGES
& EARTHWORKS BETWEEN DIVA AND KALYAN STATION
32)
CONSTRUCTION OF ROAD UNDER BRIDGE AT RAILWAY Km 1126/28 ONNAGPUR KALAMANA SECTION
33)
PROPOSED REHABILITATION OF EXIST 12/9.14M ARCH BRIDGE
WITH EXTENSION OF BARREL LENGTH
34)
CONSTRUCTION OF ROAD UNDER BRIDGE BY BOX PUSHINGTECHNOLOGY WITH CONTRACTOR'S OWN DESIGN
35)
REHABILITATION OF BRIDGE NO.62/3 AT Km.62/13-14 SECTION BY BOXPUSHING TECHNIQUE
36)
WATER PIPE UNDER TRACK AT PUNE-WADI SECTION BY PUSHINGTECHNIQUE METHOD.
37)
CONSTRUCTION OF PROPOSED TWO RCC TWIN BOX TYPE
BRIDGES IN BETWEEN PUNARAKH & BARH
38)
THOROUGH SLEEPER RENEWAL INCLUDING DEEP SCREENING &
PUCCA DRAIN
39)
REHABILITATION OF ARCH BRIDGES BY INTERNING TO ARCHES AND
JACKETING
40)
REBUILDING OF BRIDGE BETWEEN PALGHAR AND BOISAR SECTION
41)
CONSTRUCTION OF RUB 9.5m x 4.5m ON RING ROAD AT NARENDRA
NAGAR
42)
DESIGN AND CONSTRUCTION OF SUBWAY BY BOX PUSHING METHOD AT KALYAN
END OF KURLA STATION.
43)
W.S.AUG. TO PARUR MUNICIPALITY & ADJ. PANCHAYATHS IMPROVEMENTS TO CHOWARA TO PARUR SUMP
44)
WATER SUPPLY AUGMENTATION TO PARUR
MUNICIPALITY & ADJ. PANCHAYAT
45)
CONSTRUCTION OF
RCC BOX BY BOX PUSHINGTECHNIQUE AND CAST
ON BILASPUR
- HOWRAH SECTION OF SOUTH EAST CENTRAL RAILWAY
46)
REHABILITATION OF ARCH BRIDGES
BY INTERNING TO ARCHES & JACKETING
TO ABUTMENT PIERS FOR BRIDGE
NO. 503/1 & 489/3 ON PUNE-WADI SECTION.
47)
CONSTRUCTION OF THE ROAD UNDER
BRIDGE BETWEEN OHE MAST
NO.860/14-16
ON NAGPUR-HOWRAH SECTION BY BOX PUSHING TECHNOLOGY
48)
THROUGH SLEEPER RENEWAL OF P.WAY
MATERIAL BETWEEN
KMS.
233.70 TO 245.70 - 12 TKMS UP ROAD ON PUNE-WADI SECTION.
|