PROJECTS COMPLETED

 

        1)  CONSTRUCTION OF POL TANK WAGON , BRIDGE & LAYING OF TRACKS.

         2)  EARTHWORK IN FORMATION , CONSTRUCTION OF BRIDGE & COMMISSIONING OF SIDING.

         3)  PROVIDING LPG BOTTLING PLANT & CIVIL WORK OF SHED.

         4)  DIFFUSED AERATION SYSTEM , PLANT & DOMESTIC PILING SYSTEM OF WWTF PLANT.

         5)  CONSTRUCTION OF OVERHEAD TANK, MUMBAI.

         6)  CONSTRUCTION OF COMPOUND VALVE, VERSOVA.

         7)  CONSTRUCTION OF MAJOR BRIDGE AT 2174.

         8)  CONSTRUCTION OF MAJOR BRIDGE AT 400/2 & 383/2.

         9)  CONSTRUCTION OF MAJOR BRIDGE AT CH 3425.

         10)  CONSTRUCTION OF MAJOR BRIDGE , GAUGE CONVERSION 411/3.

         11)  SUPPLY OF 50mm HAND BROKEN STONE BALLAST.

         12)  SUPPLY & STACKING OF HAND BROKEN BALLAST.

         13)  CONSTRUCTION OF FOUNDATION STRUCTURE , DAUND.

         14)  CONSTRUCTION OF FOUNDATION STRUCTURE , AHMEDNAGAR.

         15)  CONSTRUCTION OF WIDENING OF MINOR BRIDGE 516 - 589.

         16)  CONSTRUCTION OF FOUNDATION & SUBSTRUCTURE OF ROB.

         17)  CONSTRUCTION OF COMPRESSOR ROOM , DHULE.

         18)  CONSTRUCTION / REPAIR OF EXISTING ROAD OF M/s IOC AT AURANGABAD.

         19)  CONSTRUCTION OF SALES Bldg., AT BELAPUR Dist.DHULE.

         20)  DEVELOPMENT OF RETAIL OUTLET , M/S IOCL.

         21)  COMPLETE TRACK RENOVATION WORK OF UPGRADATION OF KALUMNA KORADI.

         22)  DIVERSION ROAD FOR ROB AT KHEDGAON.

         23)  DEVELOPMENT OF MAFAH RETAIL OUTLET AT ORISSA.

         24)  DEVELOPMENT OF MAFAH SITE RETAIL OUTLET AT ARJUNDA (ORISSA).

                FOR M/s BPCL-PHASE-II WORKS.

         25)  CONSTRUCTION OF SUPER-STRUCTURE FOR R.O.B AT CHALISGAON.

         26)  CONSTRUCTION OF ADDITIONAL OPENING FOR WIDENING OF BRAHMANWADA NALLA IN 

                MUMBAI DIVISION OF CENTRAL RAILWAY.

         27)  REHABILITATION OF Br.No.403/1 BY JACKETING OF ABUTMENTS WITH DESIGN MIX CONCRETE IN 

                IGATPURI-BHUSAWAL.

         28)  THROUGH SLEEPER RENEWAL INCLUDING DEEP SCREENING LOADING, UNLOADING OF 

                P.WAY MATERIAL.

         29)  PERMANENT WATER SUPPLY TO TAPP AT TARAPUR , USING SPACE BLOCKS.

         30)  PROVIDING , LOWERING, LAYING, JOINTING, TESTING OF WATER MAIN LINE BY JACK & PUSHING 

                METHOD AT RAILWAY CROSSING , PUNE.

         31)  DESIGNING AND EXTENSION OF BRIDGES & EARTHWORKS BETWEEN DIVA AND KALYAN STATION

         32)  CONSTRUCTION OF ROAD UNDER BRIDGE AT RAILWAY Km 1126/28 ONNAGPUR KALAMANA SECTION 

         33)  PROPOSED REHABILITATION OF EXIST 12/9.14M ARCH BRIDGE WITH EXTENSION OF BARREL LENGTH

         34)  CONSTRUCTION OF ROAD UNDER BRIDGE BY BOX PUSHINGTECHNOLOGY WITH CONTRACTOR'S OWN DESIGN

         35)  REHABILITATION OF BRIDGE NO.62/3 AT Km.62/13-14 SECTION BY BOXPUSHING TECHNIQUE

         36)  WATER PIPE UNDER TRACK AT PUNE-WADI SECTION BY PUSHINGTECHNIQUE METHOD.

         37)  CONSTRUCTION OF PROPOSED TWO RCC TWIN BOX TYPE BRIDGES IN BETWEEN PUNARAKH & BARH

         38)  THOROUGH SLEEPER RENEWAL INCLUDING DEEP SCREENING & PUCCA DRAIN

         39)  REHABILITATION OF ARCH BRIDGES BY INTERNING TO ARCHES AND JACKETING 

         40)  REBUILDING OF BRIDGE BETWEEN PALGHAR AND BOISAR SECTION 

         41)  CONSTRUCTION OF RUB 9.5m x 4.5m ON RING ROAD AT NARENDRA NAGAR

         42)  DESIGN AND CONSTRUCTION OF SUBWAY BY BOX PUSHING METHOD AT KALYAN END OF KURLA STATION.

         43)  W.S.AUG. TO PARUR MUNICIPALITY & ADJ. PANCHAYATHS IMPROVEMENTS TO CHOWARA TO PARUR SUMP

         44)  WATER SUPPLY AUGMENTATION TO PARUR MUNICIPALITY & ADJ. PANCHAYAT

         45)  CONSTRUCTION OF RCC BOX BY BOX PUSHINGTECHNIQUE AND CAST

                ON BILASPUR - HOWRAH SECTION OF SOUTH EAST CENTRAL RAILWAY

         46)  REHABILITATION OF ARCH BRIDGES BY INTERNING TO ARCHES & JACKETING
                TO ABUTMENT PIERS FOR BRIDGE NO. 503/1 & 489/3 ON PUNE-WADI SECTION.

         47)  CONSTRUCTION OF THE ROAD UNDER BRIDGE BETWEEN OHE MAST
               
NO.860/14-16 ON NAGPUR-HOWRAH SECTION BY BOX PUSHING TECHNOLOGY

         48)  THROUGH SLEEPER RENEWAL OF P.WAY MATERIAL BETWEEN
               
KMS. 233.70 TO 245.70 - 12 TKMS UP ROAD ON PUNE-WADI SECTION.

 